Watcher Backlog Specifications¶
The Watcher spec backlog is a place for the team to record decisions about technical problems and proposed solutions. A backlog spec should contain at least a clear problem description, as well as a general description of the proposed or desired solution. This serves as a marker to record the team’s acceptance of a problem as in-scope for the project, as well as a reasonable direction for solving the problem.
A spec that exists here is something that either needs a driver or implementor, or something that can’t be done currently. If you would like to implement one of these specifications, fill out the missing sections and follow the standard process of submitting it to a release (See Watcher Project Plans).
Template:
Approved (but not implemented) backlog specs: